The GAO has performed an annual review of the Space Launch System every year since 2014 and switched to reviewing the Artemis program in 2019.
Each year the GAO points out Nasa isn’t tracking any costs and Nasa argues with the GAO about the costs they assign. Then the GAO points out Nasa has no concrete plan to reduce costs, Nasa then goes nu’uh (see the articles cost reduction “objectives”).
The last two reports have focused on the RS-25 engine, last time the GAO was unhappy because an engine cost Nasa $100 million and Nasa had just granted a development contract to reduce the cost of the engine.
However if you took the headline cost of the contract and split it over planned engines it was greater than the desired cost savings. Nasa response was development costs don’t count.
Congress reviews GAO reports and decides to give SLS more money.
Why?
The GAO has performed an annual review of the Space Launch System every year since 2014 and switched to reviewing the Artemis program in 2019.
Each year the GAO points out Nasa isn’t tracking any costs and Nasa argues with the GAO about the costs they assign. Then the GAO points out Nasa has no concrete plan to reduce costs, Nasa then goes nu’uh (see the articles cost reduction “objectives”).
The last two reports have focused on the RS-25 engine, last time the GAO was unhappy because an engine cost Nasa $100 million and Nasa had just granted a development contract to reduce the cost of the engine.
However if you took the headline cost of the contract and split it over planned engines it was greater than the desired cost savings. Nasa response was development costs don’t count.
Congress reviews GAO reports and decides to give SLS more money.
they’re wasting money like nobody’s business.